| |
|
|
| |
EBL supplies 12 lifting systems to Madrid airport
EBL has got the order to supply a number of 12 baggage lifting systems to the new terminal at Madrid Airport. The installation will be in operation when the new terminal will be taken into operation during 2006.
|
|
| |
|
|
|